Review Primo Carpentry LLC’s Connecticut residential home-improvement registration, current insurance documentation and individual OSHA 30 Construction training.
General Liability, Commercial Automobile, Umbrella/Excess and Workers’ Compensation/Employers Liability. Request the current COI for your project.
Individual training completed
OSHA 30 Construction
A company representative completed OSHA 30 Construction training through 360training.com on 12/25/2024. Individual training; not company certification.
Insurance at a glance
Insurance Coverage & Limits
Limits shown in Primo Carpentry LLC’s Certificate of Insurance dated March 5, 2026. Amounts are in US dollars; each limit has its own basis.
General Liability
Jan 5, 2026 – Jan 5, 2027
Each occurrence
$1,000,000
General aggregate
$2,000,000
Products / completed operations aggregate
$2,000,000
Personal & advertising injury
$1,000,000
Damage to rented premises, each occurrence
$100,000
Medical expenses, any one person
$5,000
Commercial Auto
Jan 8, 2026 – Jan 8, 2027
Combined single limit, each accident Scheduled autos
$1,000,000
Umbrella Liability
Jan 8, 2026 – Jan 8, 2027
Each occurrence
$5,000,000
Aggregate
$5,000,000
Workers’ Compensation & Employers’ Liability
Dec 22, 2025 – Dec 22, 2026
Workers’ Compensation
Statutory limits
Employers’ Liability, each accident
$1,000,000
Employers’ Liability, disease / each employee
$1,000,000
Employers’ Liability, disease / policy limit
$1,000,000
Coverage is subject to policy terms, exclusions and effective dates. Limits may be reduced by paid claims. This summary does not amend coverage or confirm project-specific eligibility. Request a current COI for your project.
A company representative completed individual OSHA 30 Construction training on 12/25/2024.
Ask about access to the individual record
What you can request before work begins
Current Certificate of Insurance
Official CT HIC record path
Authorized individual training record
Written project scope
Schedule and access information
Project-specific documentation
What the records mean
One project file. Four ways to read it.
Credentials do not replace project review. They help each person ask the right question before scope, access and documentation are finalized.
Homeowner
Verify the residential record and the current insurance path.
Then align scope, property protection and changes in writing.
CT HIC · Insurance
Builder / GC
Match the COI and site documents to the project.
Confirm which individual training records are relevant to assigned roles.
COI · Requirements · Training relevance
Commercial property team
Define what the property requires before access.
Review insurance, written scope and site-specific documentation.
COI · Scope · Access
Property manager
Keep the vendor file ready for the occupied space.
Confirm current evidence, contacts, scope, access and refresh points.
COI · Coordination · Written scope
Before work begins
Verify. Align. Document.
The evidence stays factual. Its relevance changes with the project and the person reviewing it.
Project readiness
A shared foundation. Two project contexts.
Some preparation belongs in every project conversation. The records and requirements that follow depend on whether the work is residential home improvement or commercial carpentry.
Shared before work begins
Defined written scopeWork, assumptions and responsibilities.
Current informationRecords reviewed for the assignment.
Access and communicationContacts, schedule and site expectations.
Residential first
Connecticut residential readiness
Use the CT HIC record for applicable residential home-improvement work, then review insurance, scope, protection and changes in the context of the home.
CT HIC registrationConfirm the current residential record.
Current insuranceRequest and compare it with the planned scope.
Written project scopeIncluded work, materials, access and schedule.
Protection and changesAlign property protection and documented changes.
Registration supports record review; it does not guarantee performance or replace project documentation.
Commercial context
Commercial project readiness
Use the current COI and the actual project requirements to define insurance, access, safety coordination and documentation for the site.
Current COICompare with project-specific insurance requirements.
Access and scheduleCoordinate occupied-space and site access.
Safety requirementsConfirm orientation or training required by the project.
Project documentsAlign scope, interfaces, changes and contacts.
CT HIC is not universal commercial licensing. OSHA 30 completion is an individual record.
Use the official Connecticut eLicense lookup and search for Primo Carpentry LLC or registration HIC.0644638. The current term shown on this page is effective 04/01/2026 through 03/31/2027.
Yes. Request the current COI through Primo Carpentry’s contact page. The public summary covers General Liability, Commercial Automobile, Umbrella/Excess and Workers’ Compensation/Employers Liability; private policy details are not published here.
Yes. Project-specific insurance and documentation requirements should be reviewed against the current COI, written scope, property conditions and the parties involved before work begins.
A company representative completed individual OSHA 30 Construction training through 360training.com on 12/25/2024. This is individual training, not company certification, and it does not replace site-specific requirements.
No. Connecticut HIC registration applies to residential home-improvement work; it is not universal commercial licensing. Commercial projects may have different insurance, access, safety and documentation requirements.
Use the official record and request current documents when planning a project. Dates, coverage evidence and project requirements should be reviewed for the actual assignment rather than assumed from an earlier file.
Licenses, insurance & safety
Questions about verification, answered.
Straight answers about public records, current insurance documents, individual OSHA 30 training and project-specific requirements.
Verify the public recordUse the official Connecticut record for the current HIC registration.
Request current documentsAsk Primo about the documents needed for your project.
A prepared project starts with clarity
Credentials reviewed. Next steps made clear.
Use the document request path when you need current records. Use the project conversation when scope, access, timing or site requirements need to be discussed.
Documentation and requirements are reviewed in their actual project context; no universal outcome is promised.
Cookie Consent
We use essential technologies to operate this website. With your permission, we also use optional technologies to measure website use and load third-party features. You can accept, reject or customize these choices.
Cookie Settings
Choose which optional technologies this browser may use. You can change your choices at any time through Cookie Settings in the footer.
Supports website security, basic functions and saving your privacy choices. These technologies cannot be switched off in this panel.
Name
Description
Duration
Cookie Preferences
This cookie is used to store the user's cookie consent preferences.
30 days
Helps us understand visits and website interactions so we can improve the website.
Measures website visits and interactions to help us improve the website. Loads only when Analytics is allowed.
Maintains session information for Google Analytics when Analytics is allowed.
Up to 400 days
Analytics visitor identifier
Distinguishes browsers for website usage measurement when Analytics is allowed.
Up to 400 days
Allows embedded maps or other third-party content to load. The provider may receive technical information when you use these features.
Displays the business location through an embedded map. Google receives technical information when you allow external content. You may instead open Google Maps separately.